|
8th Army Signal Long Lines Battalion
Operations Building (H36) This shows the Operations building taken from behind the Mess Hall. The 10,000-gallon water tank was one of two used on the site; the other was a 4,000-gallon tank enclosed in a small building. On this side of the site the mountain has a very sharp drop off. On to Next SceneBack to Beason - Page 1 |