|
Lane Electric Undergrounds
Dig for Transformer Trenching across the driveway to the location of our transformer they did manage to sever the water line going to the ledge. The water had been turned off. They quickly repaired it and moved on. Here they dig out the old transformer with PCB and get ready to set in another newer unit. On to Next SceneHi-Res Pic (259K) Back to Lane Electric Page 1 |