|
Lane Electric Undergrounds
Cleaning up the Mess They now work on cleaning up the mess. All the mud has to be gotten rid of. The trenches must be filled. They fill the top 18 inches of the trench with rock. New rock in brought in and spread. Several bushes did not survive the action and they replaced them and replanted them. In the end things were better than before. They even left 12 cubic yards of rock to add if there is any settling. It was a job well done. On to Next SceneHi-Res Pic (254K) Back to Lane Electric - Page 2 |