Shop Improvement Project 21 Painting of East Side Completed We have completed painting the east wall. We chose to paint the bottom brown so the splashing of the rain would not look so messy. We also dug in a 4 inch ABS pipe with 3/8 inch holes every 6 inches for water drainage. We also put in a new gutter with the downspout at the south end.. Then all was covered over with gravel. It looks nice. On to Scene 22 Back to Scene 20Hi-Res Pic (1731K) Return to Shop Project Page 3 |